Hardware

S-Formula: Singular 3-in-1 Magnetic PC Chassis

Born from one sheet of 420 stainless steel

zł1,060
已筹 zł1,060,目标 zł25,000
1 支持者
0 剩余
4 回报档位
⏳ 该项目已结束众筹

项目介绍

The S-Formula N1-4U chassis is built from a singular, solid 2mm sheet of premium 420 stainless steel, making it virtually indestructible. Unlike standard plastic or thin aluminum cases that bend or break over time, this heavy-duty construction ensures the chassis will outlast multiple generations of PC components and remain fully functional for decades. Its core 3-in-1 design (AIO desktop, open test bench, and 19-inch rack mount) encourages extreme reusability, adapting to new setups instead of ending up in a landfill, and the stainless steel body is 100% recyclable at the end of its exceptionally long life.

核心亮点

▸ Heavy‑duty 2mm 420 magnetic stainless steel construction for lifelong durability.
▸ Magnetic mounting system lets you reposition GPU, PSU, and drives without tools.
▸ 3‑in‑1 versatility: AIO desktop, open test bench, or 19" rack mount in one chassis.

技术规格

规格详情
Material2mm 420 magnetic stainless steel
Included GPU mounts2 (3D‑printed)
Included PSU brackets2 (3D‑printed for SFX)
Included fan bracket1 (120mm)
VersatilityAIO desktop, open test bench, 19" rack
Recyclable100% stainless steel
Manufacturing locationPoland
ShippingPriority shipping (Dec 2026 for early birds)

回报档位

位支持者
Support
PLN
Pledge any amount to support the project without receiving a reward.
位支持者
Super Early Bird - S-Formula
PLN796
~$203 USD
Secure the S-Formula at our lowest price—exclusive to the first 32 backers. Includes the 2mm 420 stainless steel chassis, complete magnetic mounting system, and priority shipping in December 2026 for AIO desktop, test bench, or 19" rack builds.
位支持者
Early Bird - Holiday Delivery
PLN920
~$235 USD
Get your S-Formula in time for the holidays with guaranteed delivery before year‑end. Includes the chassis and magnetic mounting system; limited to 32 backers.
位支持者
S-Formula N1-4U (Standard)
PLN920
~$235 USD
Receive the S-Formula N1-4U chassis with magnetic mounting system; ships February 2027; no holiday delivery guarantee.

风险与挑战

Main risks are manufacturing delays and holiday shipping congestion in December; however, the project limits the first batch to 100 units, sources steel locally, and has partnered with ready manufacturers, promising transparent updates if any issues arise.

项目洞察

13
TopNice 评分
zł1,060
平均认捐
Oct 13
追踪起始
4%
已达成
📝
项目更新

开发进度、发货时间线和公告

查看所有更新 ↗